[In areas where there is no public water supply available to serve the
development, plans and specifications for providing water sources, including
wells, tunnels, shafts, pumps, buildings, mains, and other appurtenant
structures and devices, shall be in conformance with the standards of the
department, and shall be approved by the director in their entirety prior to
construction. The plans and specifications shall be approved by the
department of health, State of Hawaii, as required.] Deleted 1/4/96.
As a condition precedent to connecting the subdivision water system to the
public water system, unless otherwise specified in these regulations, the
subdivider shall convey the subdivision water system to the department by
letter, and shall submit together therewith an affidavit showing the break
down as to the cost of such installation, and said subdivision water system,
after being accepted by the department, shall thereafter be maintained and
operated as a part of the public water system; provided, however, that the
department of water supply may refuse to operate and maintain facilities
installed without the department's prior approval. Prior to the commencement
of water service, and as a prerequisite to such service, the subdivider
shall deliver to the department perceptual easements for all portions of the
subdivision water system installed in other than publicly owned property.
The subdivider shall also convey to the department fee simple title to all
sites on which are located tanks, reservoirs, and pumps constructed by the
subdivider and connected to the public water system together with easements
for ingress and egress.